Transtech designs Signal Conditioners and trip modules for field applications to enable Railway Signalling Systems to continue running.


Project Details ……..
PROJECT(S)
- Railcorp NSW for crossings trip module
- Railcorp NSW for down-track lightning
- Pilbara Rail trackside lightning
- Ansaldo/Union Switch & Signal Pilbara
DATE
- 2004 thru to on-going
PROJECT SIZE
- More than 100 x PTD-VC special modules
- Over 800 transient protectors Pilbara Rail
- Over 300 transient protectors Railcorp NSW
CONSULTANT
- Various
FEATURES
- Trip modules designed for low supply volts
- Ease of Installation
- Transient modules comply to AS 1768
- DIN mounting for panel work